Scarf buckle
DRAWING:
PRODUCT DESCRIPTION:
OVERVIEW | DETAILS | OTHER OPTIONS | ||||
---|---|---|---|---|---|---|
Standard | Non-standard | ISO,GB,DIN,JIS,ANSI,BSW, or base on the Drawings or Samples | ||||
Processing | Casting process, Welding process | Casting process; Machining process; Milling process; Drilling process; Tapping process; Grinding process; etc. |
||||
Size | 30 | Specification Range: Thickness:10~20mm |
||||
Thread type | No | Partial thread,Dog point,Machanical thread,etc. | ||||
Material | Brass | Zinc alloy: Die steel: Brass: Aluminum: Copper: Magnesium: Tin: Lead; etc. |
||||
Hardness | Material hardness | Usually do not need to be hardened; |
||||
Finish | Polishing,Gold plated | Usually hanging plating process. Sand blasting, phosphating, polishing, spraying, oxidation, electroplating, electrophoresis |
||||
Range of application | The specific application scope of die casting parts mainly includes: automobile manufacturing, internal combustion engine production, motorcycle manufacturing, motor manufacturing, oil pump manufacturing, transmission machinery manufacturing, construction, hardware, equipment, machine tools, ships, aerospace, automobiles, locomotives, electronics, computers, electrical appliances, lamps and lanterns and so on. | |||||
Conventional packing | 1)Pack 1 pcs in small bag.Within 10kgs/ carton ,then with the wood pallet if by sea. 2)Carton size:28cm*18cm*13cm, 3)Wood pallet size:118cm*113cm,Weight:700~800Kg Bulk:0.8 cubic 4)The weight of 20 FT Container:20~25 Tons According to customer requirements. |
|||||
Production time | Usually the lead time is about 15~20 working days for sample production, 30~45 working days for mass production. |
PRODUCTION PROCESS:
MATERIAL:
SURFACE TREATMENT:
CUSTOM PACKAGING
STORE: Room temperature, sealed in plastic bag,in Carton.
.
DELIVERY: Delivery on the ground, by ocean and by air. international express company (DHL,Fedex,TNT,UPS etc.)